According to the Metis (METIS ) team, Metis (METIS ) mainnet upgrade is scheduled on block height 18,118,000 approximately on August 20, 2024. 11:00 UTC. Gate.io will support this upgrade and will suspend Metis (METIS ) network deposits and withdrawals during the process. Deposits and withdrawals will be resumed as soon as possible after this upgrade. The trading for tokens on Metis (METIS ) will not be affected.
Thank you for your understanding and continued support.
Learn more:
https://github.com/MetisProtocol/metis-ansible
https://metisl2.medium.com/metis-hard-fork-at-18118000-35cf3b7a37e9
Gateway to Crypto
Trade over 1,700 cryptocurrencies safely, quickly and easily on Gate.io
Sign up to enter the crypto gateway and get 40% commission from referrals
Download iOS/Android App right now.
Reach out to us!
Twitter:
https://twitter.com/gate_io
GateVIP Twitter:
https://twitter.com/Gateio_Inst
Telegram:
https://t.me/gate_zh
API Telegram:
https://t.me/gateioapi
Instagram:
https://www.instagram.com/gateioglobal
Medium:
https://gateio.medium.com/
Podcast:
https://gateio.buzzsprout.com/?ch=buzzs
Gate.io Team
August 14, 2024