According to the Kava (KAVA) team, Kava 16 upgrade is scheduled at block #9561866 estimated at 15:00 UTC on April 24, 2024. Gate.io supports this upgrade and will suspend Kava (KAVA) deposits and withdrawals during the process. Deposits and withdrawals will be resumed as soon as possible after this upgrade. Kava (KAVA) trading will not be affected.
Thank you for your understanding and continued support.
Learn more:
https://github.com/Kava-Labs/kava/releases/tag/v0.26.0
Gateway to Crypto
Trade over 1,700 cryptocurrencies safely, quickly and easily on Gate.io
Sign up to enter the crypto gateway and get 40% commission from referrals
Download iOS/Android App right now.
Reach out to us!
Twitter:
https://twitter.com/gate_io
GateVIP Twitter:
https://twitter.com/Gateio_Inst
Telegram:
https://t.me/gate_zh
API Telegram:
https://t.me/gateioapi
Instagram:
https://www.instagram.com/gateioglobal
Medium:
https://gateio.medium.com/
Podcast:
https://gateio.buzzsprout.com/?ch=buzzs
Gate.io Team
April 17, 2024